
Clean Energy Where the Buffalo Roam
Torrance, Calif. (June 4, 2014) – The nation’s oldest National Park is ready for some new power. Toyota Camry hybrid batteries will soon power the Lamar Buffalo Ranch field campus in Yellowstone National Park. It’s a new lease on life for the batteries and new, zero emission, energy option for the Park. Now that’s a “bear-able” solution!
The stationary distributed energy system will feature 208 used Camry Hybrid nickel-metal hydride battery packs and a total storage capacity…



